TMS in conjunction with Cape Flattery Silica Mine conducted remediation.
Works on the Southern Mooring Dolphin. This included abrasive blasting and protective coating application.
Project was completed within a scheduled shut down to reduce downtime to shipping operations.
Remediation works were completed within scheduled timeline with now impact to ongoing shipping operations.
107 Draper Street, Portsmith, CAIRNS 4870, QLD, Australia
Copyright © 2025 Tailored Marine Solutions · Privacy Policy